Wollongong, Illawarra & Shoalhaven 24/7 emergency call-outs Lic. 404250C
COASTELECTRICAL CO

Commercial

Mains and sub-mains cabling

Correctly sized cabling from the main switchboard to distribution boards, tenancies, workshops and outbuildings. Installed neatly, tested and documented.

  • Free quotes
  • Fixed price upfront
  • 24/7 emergency call-outs
  • Local to the Illawarra

We service a large area including Wollongong, the Illawarra and Shoalhaven regions, including Nowra, Kiama, Helensburgh & surrounding regions. See all areas we cover

What we do

  • Sub-mains to new distribution boards
  • Cabling to tenancies and units
  • Sub-mains to workshops and sheds
  • Cable tray, conduit and underground runs
  • Cable sizing for load and voltage drop
  • Testing and documentation
Sub-mains terminated in a distribution board
Sub-mains terminated in a distribution board

Sized for the load, now and later

We size cables for the actual load, the run length and voltage drop, and allow for growth where you tell us it's planned, so you don't have to run it again next year.

Neat, protected runs

Cables go in tray, conduit or underground as the site needs, clearly labelled at both ends.

How it works

  1. 1

    Call, text or send the job

    Tell us what you need. Photos help. You'll deal with Jade directly, not a call centre.

  2. 2

    Get a fixed price

    You get a clear, written price before any work starts. No hourly meter running, no surprise bills.

  3. 3

    Job done properly

    Turned up when we said, done safely, tested, and cleaned up after.

The Coast Electrical promise

No surprises. No mess. No chasing.

Fixed price, in writing

You know the price before we start. If something changes, we talk to you first.

We turn up when we say

And if something holds us up, we call you before you have to chase us.

Clean and tidy

We clean up and take our rubbish with us. You won't know we were there, except it all works.

Workmanship guarantee

If anything we did isn't right, we come back and fix it free for 12 months.

Common questions

Do I need sub-mains for a new shed or workshop?

Usually, yes, if it will have its own sub-board for lights, power and equipment.

Can you run sub-mains underground?

Yes. We trench or use existing conduits, with the right depth and marker tape.

Do you liaise with the network for new supply?

Where a job needs a supply upgrade, we'll explain what's involved and who needs to do which part.

Need an electrician you can rely on?

Call or text Jade directly, or send the job details for a free, fixed-price quote.