Wollongong, Illawarra & Shoalhaven 24/7 emergency call-outs Lic. 404250C
COASTELECTRICAL CO

Commercial

Temporary power for building sites

Builder's temporary power set up early, so trades can start on day one. Installed, tested and moved as the job needs.

  • Free quotes
  • Fixed price upfront
  • 24/7 emergency call-outs
  • Local to the Illawarra

We service a large area including Wollongong, the Illawarra and Shoalhaven regions, including Nowra, Kiama, Helensburgh & surrounding regions. See all areas we cover

What we do

  • Builder's temporary power boards
  • Connection to the site supply
  • Power for site sheds and tools
  • Relocation as the build progresses
  • Safety switch protection on every outlet
  • Removal at handover
Checking a builder's temporary power board on site
Checking a builder's temporary power board on site

Ready when the trades arrive

Tell us your start date and we'll have temporary power in and tested before the first trades arrive, so nobody is waiting around.

Safe for every trade on site

Temporary boards are built for construction sites, with safety switch protection and weatherproof outlets, and checked as the job goes on.

How it works

  1. 1

    Call, text or send the job

    Tell us what you need. Photos help. You'll deal with Jade directly, not a call centre.

  2. 2

    Get a fixed price

    You get a clear, written price before any work starts. No hourly meter running, no surprise bills.

  3. 3

    Job done properly

    Turned up when we said, done safely, tested, and cleaned up after.

The Coast Electrical promise

No surprises. No mess. No chasing.

Fixed price, in writing

You know the price before we start. If something changes, we talk to you first.

We turn up when we say

And if something holds us up, we call you before you have to chase us.

Clean and tidy

We clean up and take our rubbish with us. You won't know we were there, except it all works.

Workmanship guarantee

If anything we did isn't right, we come back and fix it free for 12 months.

Common questions

How early should I book temporary power?

As soon as you have a start date. Earlier is better if the site needs a new supply.

Can you move the board as the build progresses?

Yes. We relocate it as needed and remove it at the end of the job.

Do you also do the house electrical?

Yes. Many builders use us for temporary power and then the rough-in and fit-off.

Need an electrician you can rely on?

Call or text Jade directly, or send the job details for a free, fixed-price quote.